Kingrun Transformer Instrument Co.Ltd.
CATEGORIES
  • Home
  • About Us
  • Products
    • Transformer Turns Ratio Tester
    • Transformer Winding Resistance Tester
    • Transformer Insulating Oil Tester
    • Transformer Performance Tester
    • Transformer Heat Run Tester
    • Contact(Loop)Resistance Tester
    • Partial Discharge Detectors
    • 110kV/220kV Substation Series Testers
    • Transformer Factory Series Testers
  • Download
  • Tech Blogs
    • Winding Resistance Testing
    • Insulating Oil Testing
    • Turn Ratio Testing
    • Loop Resistance Testing
    • Transformer Capability Testing
    • Partial Discharge Testing
    • Transformer Insulating Testing
    • Transformer Testing Knowledge
  • Contact Us

Tech Blogs

  • Classification of commonly used transformer oil2019-07-21
  • How to Select the Test Current when Testing DC Winding Resistance?2019-07-14
  • How to Judge Transformer Fault Through Transformer Oil Testing?2019-06-20
  • What are the concepts and differences between insulation resistance, DC resistan2019-06-10
  • What is concept of transformer insulating oil?2019-06-05
  • How to Calculate the Transformer DC Resistance Imbalance of the Transformer?2019-05-27
  • Is the ratio of the three-phase transformer the ratio of the phase voltage to th2019-05-27
  • What is the Oil-immersed Transformer?2019-03-29
  • Installation and Commissioning of Transformer in 35KV Substation2019-03-18
  • The Silent Killer in Power Systems - Partial Discharge2019-03-13
  • The Difference Between DC Resistance and Insulation Resistance in Transformer?2019-02-21
  • How to Test Insulating Oil Breakdown Voltage(BDV) by Oil BDV Tester2019-02-18
  • How to Convert between Line Resistance and Phase Resistance2019-02-14
  • What are the serious consequences of overheating of power equipment in a substat2019-01-31
  • Three-phase winding DC resistance measurement2019-01-28
  • What is the primary explosion and secondary explosion of the transformer?2019-01-24
  • Error Analysis of DC Resistance Measurement2019-01-21
  • GIS Partial Discharge Simulation System2019-01-17
  • DC winding resistance and winding insulation resistance difference2019-01-14
  • Insulating Oil Breakdown (BDV) Tester-JY6611 (Used by Hitachi)2019-01-10
« 1 ... 11121314 »
Share
Call
Menu
Top

Copy Right 2013 All Right Reserved KINGRUN website system kriSitemap