Kingrun Transformer Instrument Co.Ltd.
CATEGORIES
  • Home
  • About Us
  • Products
    • Transformer Turns Ratio Tester
    • Transformer Winding Resistance Tester
    • Transformer Insulating Oil Tester
    • Transformer Performance Tester
    • Transformer Heat Run Tester
    • Contact(Loop)Resistance Tester
    • Partial Discharge Detectors
    • 110kV/220kV Substation Series Testers
    • Transformer Factory Series Testers
  • Download
  • Tech Blogs
    • Winding Resistance Testing
    • Insulating Oil Testing
    • Turn Ratio Testing
    • Loop Resistance Testing
    • Transformer Capability Testing
    • Partial Discharge Testing
    • Transformer Insulating Testing
    • Transformer Testing Knowledge
  • Language
    • Français
    • Espagnol
  • Contact Us

Tech Blogs

  • What is the primary explosion and secondary explosion of the transformer?2019-01-24
  • Error Analysis of DC Resistance Measurement2019-01-21
  • GIS Partial Discharge Simulation System2019-01-17
  • DC winding resistance and winding insulation resistance difference2019-01-14
  • Insulating Oil Breakdown (BDV) Tester-JY6611 (Used by Hitachi)2019-01-10
  • Why need to test the DC winding resistance of the motor?2019-01-07
  • What are the serious consequences of transformers lacking periodic turn ratios a2019-01-03
  • How Important is Transformer DC Winding Resistance?2018-12-24
  • What are the serious consequences of transformers lacking periodic turn ratios a2018-12-17
  • Want a dry transformer with a longer life? These details must be noted2018-12-13
  • 5 key factors affecting tolerance during transformer winding resistance testing 2018-12-10
  • Influence of different ratios of main transformers on the operation of generator2018-12-03
  • What is the AC DC withstand voltage test of the transformer?2018-11-22
  • What is the winding insulation test of the transformer?2018-11-19
  • Why Is Transformer Neutral Grounding So Important?2018-11-16
  • How to Detect the Partial Discharge of Live GIS2018-11-15
  • How to apply ultrasonic to partial discharge test of transformer2018-11-12
  • What is the Dielectric Loss Factor of the Transformer and How is it Tested?2018-11-08
  • Method of testing the partial discharge of transformer2018-11-05
  • What is the Purpose of Transformer Winding Insulation Resistance Testing?2018-11-01
« 1 ... 11121314 »
Share
Call
Menu
Top

Copy Right 2013 All Right Reserved KINGRUN website system kriSitemap

Adds: Building 2# Torch High-tech Park Baoding city,China  Tel: +86-0312-5959618  Fax: +86 -0312-5926968